Asbestos Removal and Surveys in Liverpool City Centre

Older offices, shops and buildings converted into flats make up much of the centre. Here asbestos is usually a duty-to-manage and refurbishment question as much as a removal job.

Call 07777 659786

Get help with this

We only use your details to reply to this enquiry. Privacy policy

In Liverpool City Centre most asbestos enquiries come from owners, managing agents and tenants of older commercial buildings and conversions. The usual starting point is a survey: a management survey to meet the duty to manage, or a refurbishment and demolition survey before a fit-out or strip-out. Where ACMs need to come out, we plan removal in the right legal category, with licensed work carried out only by an HSE-licensed contractor.

Why the centre is different

The L1, L2 and L3 postcodes are dominated by offices, shops, hospitality premises and older buildings that have been converted into apartments. Many of these were built, extended or refitted before 2000, when asbestos products were still widely used in construction. That means ACMs can turn up above suspended ceilings, in risers and service ducts, around old heating plant, inside fire-rated partitions and under later floor coverings.

Unlike a house, these buildings usually have a legal duty holder. Regulation 4 of the Control of Asbestos Regulations 2012 requires whoever manages non-domestic premises, and the common parts of flats, to find out whether asbestos is present, assess its condition and manage the risk. That is why our work here so often begins with paperwork and a survey rather than a skip.

Which survey does a city centre building need?

Situation Usual survey (HSG264)
Occupied office, shop or common parts with no up-to-date record Management survey
Fit-out, strip-out, rewiring or new services Refurbishment and demolition survey of the work area
Single suspect material, such as one ceiling panel Targeted sampling and lab analysis

Surveys are carried out by a competent surveyor, and we recommend one accredited by UKAS to ISO/IEC 17020. Samples go to a UKAS-accredited laboratory working to ISO/IEC 17025. Once the findings are in, they can feed an asbestos register and management plan so contractors working in the building know what to avoid.

Planning removal around a working building

Access is the recurring challenge in the centre: shared entrances, limited loading space, occupied floors above and below, and tenants who need to keep trading. We agree working hours, routes for bagged waste and how areas will be segregated before anything starts.

The category of work drives the timetable. Licensable work, for example on most insulating board or pipe lagging, has to be notified to the enforcing authority on form ASB5 at least 14 days before it begins, and is done inside a controlled enclosure. Afterwards an independent UKAS-accredited analyst carries out four-stage clearance and issues a certificate of reoccupation. Notifiable non-licensed work must be notified before it starts. Our commercial asbestos removal page explains the process for business premises in more depth.

If contractors uncover a suspect board, lagging or debris during works, stop in that area, keep people out and do not sweep or vacuum. Get the material checked before work resumes.

Beyond the centre

Many of the same landlords and agents hold property in the suburbs too. We regularly work in the Victorian terraces of Wavertree and Walton, and across the river in Birkenhead. For a fuller picture of what we offer, see our main page on asbestos removal in Liverpool, or read how we approach asbestos surveys and removal across Merseyside.

Managing an older building in L1, L2 or L3?

Call 07777 659786 with the building type, what records you already hold and any works planned. We will call back and suggest a sensible next step.

Frequently asked questions

Who is responsible for asbestos in a city centre office or shop?

Under regulation 4 of CAR 2012 the duty to manage sits with whoever controls maintenance and repair of non-domestic premises, which may be the owner, a managing agent or a tenant depending on the lease. Leases split responsibilities in different ways, so check the wording and current HSE guidance, or take advice if it is unclear.

Does a block of flats in a converted building need an asbestos survey?

The common parts of buildings converted into flats, such as stairwells, corridors, plant rooms and lofts, fall under the duty to manage. Whoever is responsible for those parts needs to know whether ACMs are present and keep a record. Inside the individual flats the duty is different, but anyone carrying out work there must still prevent exposure.

Can a shop fit-out go ahead before the asbestos survey comes back?

Work that disturbs the fabric should wait until a refurbishment and demolition survey of the affected areas has been done and the results reviewed. If ACMs are found, the removal category decides how much notice is needed, so it helps to build the survey into the programme early rather than at the last minute.

What happens to asbestos waste from a city centre site?

It is treated as hazardous waste: double-bagged or wrapped, labelled, carried by a registered waste carrier to a site permitted to take it, and moved with a hazardous waste consignment note. On a tight urban site we plan where bagged waste is held securely before collection so it is not left in shared areas.

Do you also handle older residential buildings in the centre?

Yes. Apartments, conversions and older houses on the fringes of the centre can contain textured ceilings, floor tiles, insulating board or cement products, depending on when they were built or refurbished. We talk through the material, its condition and the work you are planning before suggesting sampling, a survey or removal.

Call 07777 659786